Location
Central and West TX
Project Value
$1.7B
Highlights
-
Cost Savings
-
Efficient Project Management
-
Streamlined Material Management
Revolutionizing Construction Oversight for ONCOR Electric Delivery
The Challenge
- Improve collaboration between field teams and the engineering department.
- Enhance communication of issues related to material, right-of-way, permitting, and other project challenges.
- Streamline tracking of project progress across the entire program.
- Minimize the impact of material issues on construction by detecting problems early and holding vendors accountable.
The Solution
- Real-time Project Progress Tracking: Think Power personnel utilized advanced technology to track project progress in real-time, analyzing data against pre-defined metrics and providing automatic updates to project managers.
- Timely Issue Communication: Engineering teams were promptly informed of field issues with documentation, facilitating swift resolutions and substantial cost-savings.
- Comprehensive Project Monitoring: The Think Power PMO team monitored overall project reporting, scheduling, and staffing to ensure accurate project information was communicated and projects remained on track to meet schedule milestones.
- Cost Reduction Measures: Think Power implemented accurate real-time monitoring of planned vs. actual budgets, resulting in significant cost reductions across the CAPEX program.
- Material Issue Management: Through effective data collection and automated analytics, Think Power identified and quantified material issues for ONCOR, providing actionable intelligence and minimizing the impact of material-related challenges.
- Quality Assurance/Quality Control (QA/QC) Feedback: Classified material issues identified in the field provided valuable feedback to material vendors, enabling improvements in their quality control processes.
Key Benefits
- Enhanced Collaboration: Improved collaboration between field teams and the engineering department.
- Cost Savings: Significant cost reductions achieved through real-time budget monitoring and issue resolution.
- Efficient Project Management: Streamlined project tracking and communication led to improved project management efficiency.
- Streamlined Material Management: Proactive identification and management of material issues resulted in reduced project delays and extra expenditures.
- Continuous Improvement: Valuable QA/QC feedback provided to material vendors facilitated ongoing improvements in their manufacturing processes.