Customer
PEC
Location
Texas
Highlights
-
Designed overhead line in a constrained ROW
-
Navigated safety around a high-pressure gas line
-
Ensured compliance with updated utility protocols
Overhead Line Design for PEC Oak Hill: A Safety-First Approach
The Challenge
PEC Oak Hill required a new overhead double circuit line to connect feeder lines from multiple substations, ensuring a consistent and reliable power supply. The project had to be executed within an existing utility right-of-way (ROW), which presented significant design and safety challenges. A major obstacle was the presence of a 10-inch high-pressure gas line, which posed a serious risk during construction and required strict compliance with updated safety protocols.
The Solution
Think Power Solutions was selected for our proven expertise in complex utility infrastructure projects. We provided end-to-end services, including:
- Data Collection to map existing utilities and ROW constraints
- Design of the overhead double circuit line with safety-first engineering
- Project Management to coordinate stakeholders and timelines
- Construction Oversight to ensure field execution aligned with safety and design standards
- A minimum 3-foot clearance from the gas line
- A gas company representative on-site for any work within 3–5 feet
Key Benefits
- Full-Scope Delivery: From data collection to construction oversight, ensuring consistency and accountability
- Safety & Compliance: Met all updated gas utility protocols
- Stakeholder Coordination: Maintained clear communication with the gas company and PEC Oak Hill
- Efficient Execution: Delivered a safe, regulation-compliant design within project timelines
The Results
Think Power Solutions delivered a fully compliant, safely designed overhead double circuit line that met PEC Oak Hill’s operational goals. Our comprehensive service approach and proactive risk management ensured the project was completed without incident, reinforcing our reputation as a trusted partner in utility infrastructure.