Field Obstruction Resolved Without Delaying Construction
-
Landowner Engagement Prevented Major Redesign
-
Full-Scope Utility Design and Project Management Delivered
Resolving Utility Design Conflicts Through Real-Time Coordination
The Challenge
Root Cause Analysis
- Landowner Construction Interference: The fence placement occurred after the initial planning phase, introducing a spatial conflict with utility infrastructure.
- Time-Sensitive Impact: Delaying pole installation would have slowed the broader construction schedule, increasing project risk and costs.
- Field Conditions Shift: Evolving site conditions reinforced the need for active, on-the-ground coordination with property stakeholders.
The Solution
Immediate Landowner Engagement
While in the field, the project manager contacted the landowner and outlined the issue, offering clear options for resolution. The goal was to find a mutually agreeable solution without escalating the issue or halting progress.Design Adjustment Without Delay
That same afternoon, the landowner selected an option that allowed Think Power Solutions to proceed. The team implemented a minor layout adjustment that preserved the original design intent and construction timeline, without compromising utility standards.Full-Scope Service Delivery
From easements and TXDOT permits to field engineering and construction oversight, Think Power Solutions provided end-to-end execution, ensuring that challenges like this were quickly absorbed and resolved.Key Benefits
- Minimal Downtime: The issue was resolved within hours, preserving the project schedule.
- Proactive Communication: Direct stakeholder involvement turned a potential delay into a collaborative solution.
- Design Integrity Preserved: Adjustments were made within design standards, maintaining safety and system requirements.
- Client Assurance: PEC received responsive, professional handling of an unexpected obstacle.