Customer
PEC
Location
Texas
Highlights
-
Anchor Conflict with New Fence Resolved Without Delay
-
Structural Integrity Maintained Through Field Adjustment
-
Timeline and Design Standards Fully Preserved
Anchor Layout Adjustment Enables Seamless Utility Design in High-Value Development
The Challenge
Root Cause Analysis
- Site Interference: Newly constructed fencing was not reflected in earlier design data.
- Anchor Obstruction: One of the two planned support anchors could not be installed in its designated location.
- Design Constraints: All field modifications needed to adhere to engineering and structural standards for safe riser pole installation.
The Solution
Field-Based Design Adjustment
Rather than halt work or request fence removal, the Think Power Solutions designer evaluated the site conditions in real time and modified the anchor layout on-site.Engineering Compliance Maintained
By reducing the anchor spacing within acceptable tolerances, the team maintained full compliance with PEC standards while resolving the obstruction.Project Timeline Protected
This immediate field solution avoided rework, design escalation, or permit delays, keeping the broader development’s construction schedule on track.Key Benefits
- Zero Delays: Field decision-making kept the project moving without interruption.
- Cost Avoidance: No redesign or demolition was required.
- High-Value Site Coordination: Reinforced Think Power Solutions’ ability to adapt within complex, high-stakes developments.
- Engineering Confidence: Adjustments were made without compromising structural performance or safety.