Customer
PEC
Location
Texas
Highlights
-
Accurate Staking Completed Despite Hard Ground and High Temperatures
-
Enabled Timely Pole Relocation and Line Routing for Subdivision Developmen
Staking Support Ensures Readiness for New Subdivision Infrastructure
The Challenge
Root Cause Analysis
- Environmental Conditions: High temperatures and hard ground created difficult staking conditions.
- Large Scope of Work: Completing all staking on schedule required careful planning and consistent productivity.
- Dynamic Site Conditions: Construction preparation in the area increased the chance that some stakes could need re-setting.
The Solution
Field Preparation and Obstruction Management
Field crews removed rocks and other objects that interfered with staking. This ensured stakes were installed securely and precisely.Sequenced Scheduling and Pacing
The work was divided over several days to maintain accuracy and manage heat exposure, reducing the risk of fatigue-related errors.Experienced Project Management
Drawing on extensive experience in the region, Think Power Solutions planned the staking approach to anticipate likely obstacles and keep the project progressing safely and efficiently.Key Benefits
- Timely Infrastructure Readiness: All required staking was completed in a manageable timeframe, supporting subdivision construction schedules.
- Safety and Quality Maintained: Crews worked safely despite challenging ground and heat conditions.
- Reduced Rework Risk: Proactive field preparation helped prevent delays or additional site visits.